top of page

BRICK MID-RISE BUILDING
Project Type
Scope
Storeys
Location
Year
Commercial
Seismic Assessment & Retrofit
3
Wellington
2013
The corner building presented several engineering challenges. The building had been retrofitted in the 90's using flexible steel frames and diaphragms, the displacement compatibility between the bricks and steel frames was a challenge to model. DTCE concept retrofit design gave the owners enough information to decide to demolish the building instead of retrofitting.





bottom of page